%0 Journal Article %T A SCOR-based Sustainable Performance Evaluation System: A Case of Sepahan Cement Company %J Industrial Management Journal %I University of Tehran %Z 2008-5885 %A Razi Khaneqah, Zeynab %A Foukerdi, Amirali %D 2021 %\ 12/22/2021 %V 13 %N 2 %P 246-277 %! A SCOR-based Sustainable Performance Evaluation System: A Case of Sepahan Cement Company %K Sustainable Performance Evaluation System %K Cement Supply Chain %K Supply chain operational reference model %K Interpretive-Structural Modeling %R 10.22059/imj.2021.319358.1007824 %X Objective: This research pursues two main objectives: 1) designing an integrated system for ‎evaluating sustainable performance with an emphasis on the main executive processes of the ‎cement supply chain, and 2) identifying the position and role of the criteria of this system ‎in interaction with each other.‎ Methods: Achieving these goals in Sepahan Cement Company (SCC) is pursued in two phases. First, the supply chain ‎operations reference (SCOR) model is used to design an integrated framework for ‎evaluating the sustainable performance of the cement supply chain (CSC). Second, interpretive-structural modeling (ISM) and MICMAC analysis are used to analyze the position and role ‎of sustainable performance criteria in CSC main processes.‎ Results: In total, 16 environmental criteria, 10 economic criteria, and 4 social criteria ‎were identified. The contribution of the executive processes of sourcing, manufacturing, ‎delivery, and return of the cement supply chain from these criteria were 11, 15, 7, and 6 ‎criteria, respectively. In each process, key and effective criteria that played a fundamental ‎role in promoting process sustainability were identified.‎ Conclusion: Not all SCC processes play the same role in improving various ‎aspects of sustainability (society, environment, economy). Identifying the key and ‎effective metrics of each process provides managers and policymakers with an ‎appropriate perspective on the preparation of sustainability improvement projects. Despite ‎the presence of economic criteria in all four executive processes of the cement supply ‎chain, the effectiveness of these criteria is not the same in all processes. Therefore, the ‎preferences of decision-makers can be different regarding the prioritization of projects to improve the ‎sustainability of SCC. %U https://imj.ut.ac.ir/article_85308_423f54e21941c48f1194f4380b1f90e7.pdf